Friday, January 23, 2015

Timber Construction, Paramount Construction, LLC.

Banquet Hall


Wood pins installed with linseed oil, metal ties available
Pine tongue and groove vaulted ceiling

Building Canopy's



Post set on metal base plates anchored in the slab for up lifting. Mortar used between the wood base and concrete to transfer load to the ground.

Wall/roof sections are pre-built at the factory then re-assembled
at the job-site and hoisted into place



SIPs installed, water and ice on roof. More on SIPs later. 




Chapel Addition




No comments:

Post a Comment